Settled grout blocking sewer main pipeline

Projects
Los Angeles, CA

A grout mix meant for soil stabilization found its way into a vitrified clay sewer main pipeline during supportive construction for subway tunneling. The slurry settled inside the pipe causing a serious blockage.

The grout was removed by Pacific Sewer Robotics who applied a 1000bar (14,500psi) controlled water blast from a remotely operated crawler with camera and steerable nozzle. Within a few days the sewer pipe was restored to its full capacity and undamaged

Request online demonstration

Time UTC+1:

Request online demonstration

Thank you for your online demonstration request.

Your preferred date and time will soon be reviewed and login to the online meeting shared. We are looking forward to meeting you.

Best regards,
Sewer Robotics
info@sewerrobotics.com
+3174 289475
+1 503 504 8474